We recently delivered a Changing Places toilet installation for Graham Construction in the Churchill Square Shopping Centre, Brighton.
This facility came to us as a proposed layout and required a small amount of editing to ensure that the room was compliant. This included the relocation of the entrance door to enable the door to open beyond 90 degrees, ensuring that the clear space through the door exceeded the 1000mm required width.
Working with the contractors to ensure that services and popups were made available in the correct locations, we prepared drawings for signoff by the site design team.
Having installed and tested the equipment, we were able to meet the site facilities team for awareness training.